Southwest Kentucky
This week landed us in Southwest Kentucky to construct another private motocross track. The combination of beautiful scenery, optimal soil, and elevation change, provided us with the ideal conditions to create an extraordinary track. Our team installed 80' of drainage culvert at a collection point that allowed storm water runoff to flow below the track surface to a nearby retention basin. Dirt was excavated from the existing grade on-site in order to generate material for the track features. The duration of this project was one week. This project was completed on time and within budget. Projects like this remind us why we love our job!