Walnut Grove MX
Not every track we build is cut from a hillside or rolling topography. The track that we built this week for example, was built from flat terrain in only a few days. By cutting the existing grade down 12"-24" we were able to generate enough dirt to super-elevate the track lanes and build some fun track features.