Port Saint Lucie, Florida
Our team battled through wet conditions on this build. Ground water was at a digging depth of 4’ during pond excavation and therefore the soil was staged wet. We got hit with 24 hours of rain starting the second day of the project. With a never quit attitude our team cut the track open, pushed the water off, thinned out our working pad and spent a day and a half ripping the soil until we were working with buildable material. We pulled this build off and by the end of the project we had exceeded our own expectations. Knowledge and experience put into action to overcome challenges on the job is what defines a solid team.