Elgin, Illinois

This site was a densely wooded forest at the beginning of the project. Clearing operations were required in order for our team to work efficiently within the forest. The underlying root system limited any excavation within the track limits and therefore soil had to be generated in a clearing outside of our track limits and hauled into the track area. Even though this track required a few extra steps to be built the right way, the finished track takes you on a ride through the forest and that’s exactly what our customer asked for!

John Steiner